The cup holders took the longest. probably 3 days, I put a 4 LED puck in the bottom and filled the cupholder with a clear acrylic epoxy so that the bottom was flat and the drinks wouldn't hit the LED. Then I installed the entire LED's and light bar in the boat in a day. The lights are set up with one switch for the front lights, one for the back lights, and another for the LED's. The Sub is another story it took weeks with all the measuring and fitting and sealing and painting , etc. but the end result came out nice and I'm happy. (Message edited by detonate69 on March 03, 2007)
|